EXCAVATION

CONTROLS

  • All excavations must be conducted under a Bardavcol issued Excavation Permit.

  • A Dial Before You Dig (DBYD) enquiry must be submitted for all excavations, and further visual inspections undertaken for the services.

  • All services identified in the DBYD must be physically located to ensure they will not be damaged during excavation.

  • All requirements of the Asset owners must be met.

  • All excavations deeper than 1.5m must be benched, battered, or shored appropriately.

  • All excavations over 1.5m must have a rescue plan in place.

  • All excavations over 3.0m require workers to be harnessed and a davit arm setup for rescue.

  • Plant and other items must keep out of the zone of influence of the trench.

  • Workers must not be in the trench when the excavator is digging, and must remain outside of the slew zone of the machine at all times.

  • No one can work outside of the Shoring/Battered/Benched area when in the trench.

  • Edge protection must be installed for all excavations over 1.5m.

  • All excavations must be fenced off from access after-hours, and covered if practicable.

HAZARDS

Cave In

Engulfment

Fall from Heights

Services

Plant / People Interacton