top of page

Rail Infrastructure

Gawler River Rail Bridge

Design and Construction of a rail bridge spanning the Gawler River, improving the capabilities of the line allowing for increased  speed and axle loadings 

GRRB Completed.jpg

Torrens Rail Junction

Excavation of a 120,000 cubic metre rail cutting for the Outer Harbor Railway Line under the Gawler and ARTC lines and Park Terrace including new pavements, lighting and traffic controls at Park Terrace.

Torrens Junction.jpg

Mawson Connector & Transport Interchange

The interchange facility featured two train platforms including an elevator to the overpass structure, enclosed departure lounges, sheltered walkways, kiosk, video surveillance, public transport information, bicycle lockers, taxi rank facilities, public art and landscaping.

Munno Para Railway Station

Design and construction of the upgrade to the existing Munno Para Railway Station and car parking with Construction undertaken during  a restricted period of rail closure requiring integration of activities with unrelated works being undertaken within the rail corridor.

Marion Train Station Pedestrian Underpass

The Marion Station Underpass was constructed as a replacement to the previous overpass which was removed due to clashes with the rail electrification infrastructure.  The tight time constraint of SP-A was a critical part of the project; Bardavcol was given a window of works of 22 days.

bottom of page