top of page
Rail Infrastructure
Mawson Connector & Transport Interchange
The interchange facility featured two train platforms including an elevator to the overpass structure, enclosed departure lounges, sheltered walkways, kiosk, video surveillance, public transport information, bicycle lockers, taxi rank facilities, public art and landscaping.
Marion Train Station Pedestrian Underpass
The Marion Station Underpass was constructed as a replacement to the previous overpass which was removed due to clashes with the rail electrification infrastructure. The tight time constraint of SP-A was a critical part of the project; Bardavcol was given a window of works of 22 days.
bottom of page